|
This is kind of a rhetorical question as I'm just researching something which will probably cross my path in the future that I want to be prepared for. So imagine I've fully mixed a 60 minute film. Then it goes back to the edit and they cut it down to 45 minutes, using the same footage but also adding additional shots. I've obviously done loads of work, but now everythings in a new place on the timeline, shots are shorter etc. I've got to mix this, but I've got LESS time to do it, because I've already done it once irrevelent that I've basically got a new OMF. How do I conform my original work to the new cut, in the fastest way possible, leaving me enough time to mix the new inserts?
|